Showing posts with label First flight of Tejas LSP-7. Show all posts
Showing posts with label First flight of Tejas LSP-7. Show all posts
Thursday, March 15, 2012
Tejas LSP-7 first flight video | Don't miss the roar of youngsters in HAL, our future, our pride
Propel your dreams: When LSP-7 kissed the sky...
Moving snapshots from Old HAL Airport in Bangalore when LSP-7 from Tejas flightline had its first flight on March 9, 2012. Those seen in brown trousers and cream shirts are HAL workforce, who along with ADA and NFTC officials put their best foot forward to make the platform fly. My salutes to HAL's young and energetic workforce, who passionately gave everything for the Tejas project, amidst the mess in the Company. They are the real unsung heroes of Tejas programme, sticking to a national dream, despite being lured by the private industries. Hope the new head in R K Tyagi, who seems to be clueless as of now, will set the record straight and put Tejas project on priority. Photos: HAL
(Tarmak007 welcomes onboard Vinay Kumar, 550th registered blog member.)
Friday, March 9, 2012
Breaking on Tarmak007: Tejas LSP-7 flight successful
Tejas
LSP-7 successfully completed its first flight in Bangalore on Friday. The
flight was piloted by Group Captain Venugopal of NFTC and lasted for 25 minutes. Sources say all mission parameters were met. Stand by for an update with photos.
--------------------------------
Update (Guys no time to edit. Press Release as it is below.)
--------------------------------
Update (Guys no time to edit. Press Release as it is below.)
Tejas Limited Series Production - 7 took off for its maiden flight from HAL airport at 4:27 pm on 9th March 2012. This test flight is significant for the programme, as LSP -7 build standard is close to the initial operational clearance (IOC) standard. Accordingly LSP -7 aircraft, along with LSP - 8 will be offered to the Indian Air Force for user evaluation trials (UET). The flight was also significant considering the fact that for the first time Production Test Schedule was used for the first flight of a LSP aircraft in this programme. This is also the first time maiden flight of a prototype was not accompanied by the customary ‘chase’ aircraft, which is an indicator to the level of confidence in the machine.
The flight lasted 28 minutes with Gp Capt KK Venugopal at the controls in the cockpit and Wg Cdr Kabadwal of the National Flight Test Centre (NFTC) as Test Director in the telemetry. During the test flight, performance of the aircraft systems including Multi-mode Radar (MMR), Helmet Mounted Display System (HMDS), Auto-pilot and Instrument Landing System (ILS) was satisfactory, providing a moment of pride for all the stake holders which include ADA, HAL, IAF, CEMILAC, DG AQA, ADE and NAL among others.
The flight lasted 28 minutes with Gp Capt KK Venugopal at the controls in the cockpit and Wg Cdr Kabadwal of the National Flight Test Centre (NFTC) as Test Director in the telemetry. During the test flight, performance of the aircraft systems including Multi-mode Radar (MMR), Helmet Mounted Display System (HMDS), Auto-pilot and Instrument Landing System (ILS) was satisfactory, providing a moment of pride for all the stake holders which include ADA, HAL, IAF, CEMILAC, DG AQA, ADE and NAL among others.
Labels:
First flight of Tejas LSP-7
Breaking on Tarmak007: Tejas LSP-7 all set for first flight now?
Tejas LSP-7 is all set for its first flight at Old Bangalore Airport now. The flight will be piloted by Group Captain Venugopal of NFTC and might last for 25 minutes. The pilot is doing his last-minute checks as this piece goes live. Let's hope for the best and no last-minute hitches.
Stand by for an update with photos.
Stand by for an update with photos.
Tejas LSP-7 in first flight strike zone | FRRB clears the platform after 2nd HSTT | Sky party any time now
Tejas LSP-7 undergoes final tests at HAL Airport in Bangalore.
![]() |
| THE BREAKING NEWS! |
By Anantha Krishnan M
Express News Service
Bangalore: The first flight of the limited series production (LSP-7) version of India's Light Combat Aircraft (LCA) Tejas is in a striking distance. Sources confirm to Express that the LSP-7 performed the crucial High-Speed Taxi Trial (HSTT) on Thursday in a nose-wheel-lift mode at about 260 kmph. A data analysis de-brief is scheduled on Friday (March 9) to check various parameters of the aircraft during the HSTT, which was the second one for LSP-7.Express News Service
“If the results are absolutely encouraging, then we would have the first flight any time. The Flight Readiness Review Board has already cleared the aircraft for its maiden moment in the sky,” sources said. Hindustan Aeronautics Ltd (HAL) officials at Old Bangalore Airport too confirmed that the activities relating to LSP-7 have reached a critical stage with all safety precautions put on an any-time-ready mode.
On Thursday, Grp Capt Venugopal of the National Flight Test Centre (NFTC) did the HSTT, which is a pointer that he might be the chosen one to take LSP-7 for the first flight. “It is a positive step to see more platforms joining the flight-line. We need more of them so that we can divide our tasks and put the programme on a faster pace,” a source with the Aircraft System Testing Establishment of the Indian Air Force (IAF) said.
The IAF pilots from ASTE would finally begin the evaluation once the LSP-7 is ready. “The Standard of Preparation (SOP) of this aircraft is made for user evaluation trials for both flight as well as maintenance, which is the same as the SOP of the production variant. Intensified campaign of flight trials is going on for demonstrating the performance of sensors and armaments,” HAL sources said.
With LSP-7, the 12th aircraft from the project flight-line would join the Tejas party with another (LSP-8) scheduled to be rolled out in future. Express had reported earlier about a fuel leak on LSP-7, which forced the Aeronautical Development Agency(ADA)-HAL combo to ground the entire fleet. This had pushed the programme further behind the schedule by four-five months -- the time taken by designers and engineers in re-arranging the butting of fuel and hydraulic pipes to prevent them from coming in contact.
(Copyright@The New Indian Express)
Subscribe to:
Posts (Atom)

























