Tarmak007 -- A bold blog on Indian defence: ITR

For regular updates, visit: https://www.facebook.com/Tarmak007

Clipart Clipart Clipart Clipart Clipart Clipart Clipart Clipart Clipart

Showing posts with label ITR. Show all posts
Showing posts with label ITR. Show all posts

Wednesday, January 30, 2013

K-15 SLBM is a beast loaded with gen-next tech: Scientists

By Anantha Krishnan M

Express News Service

Bangalore: The scientists at Defence Research and Development Organisation’s (DRDO) Missile Complex in Hyderabad are an inspired lot, thanks to successful test (14h one) of the 750-km range submarine-launched ballistic missile (SLBM), K-15. The missile (codenamed B-05), was tested for its full range from a submerged pontoon, off the coast of Vishakapatanam on January 27, 2013.
Sources in the Missile Complex tell Express that K-15 was launched from an underwater vehicle with an approximate depth of 50 meters. But, what adds more teeth to the killer missile is the array of gen-text technologies that are embedded onboard, a majority of features till kept under wraps. “The medium range missile, with a capacity to be launched from multiple platforms has so far undergone many trials. It is primarily employed against land targets. The missile is incorporated with very-high accuracy navigation systems with completely different and specific schemes, that can steer the vehicle towards the target with single-digit accuracy,” sources said.
The scientists have designed special alignment techniques with most modern algorithms which are specific to underwater missions. “We have used most modern computing and actuating systems for the missile. It has a two-stage booster, with one being employed under water and the other above the surface. The underwater dynamics are totally different from the aerodynamic environment. Here the hydro-dynamics come into picture and you got to take into account factors like water pressure, wave speed, its direction and many more,” sources said.
The K-15 missile is a ballistic one, but travels through the atmosphere all through the mission. It is being controlled and guided all through by onboard guidance computer system. The missile now enters probably its most-critical phase, when it will be integrated with India’s first home-grown N-powered submarine INS Arihant, which is warming up for its maiden sea-acceptance trials.
“We will have more number of trials on the naval platform, but parallely the missile will get into the production mode. Once the Indian Regional Navigation Satellite System (IRNSS) goes live next year, all our future missions will have pin-point navigation support,” sources said.
Speaking to Express from Hyderabad, Defence Research Development Laboratory (DRDL) Director and K-15 Programme Director A K Chakrabarty said his team had a challenging job on hand. “When you execute underwater missions, the rules of the game changes. While launching the missile (from a submarine) nothing should happen to the platform, considering it's a manned one. Hence, it was a huge challenge to our designers,” Chakrabarty said.
Over 200 scientists and officers from five DRDO labs, including DRDL (Hyderabad), Research Centre Imarat (Hyderabad), Advanced System Laboratory (Hyderabad), R&D Engineers (Pune) and Interim Test Range (Balasore) are involved with the K-15 project. More than 50 per cent of scientists who worked on the project are said to be youngsters holding Sc-B and Sc-C ranks in DRDO.
Copyright@The New Indian Express

GET REGULAR UPDATES FROM
 TARMAK007'S FB PAGE. CLICK
THE ICON AND LIKE THE PAGE

Thursday, December 9, 2010

Breaking on Tarmak007: India set to launch Agni-II Prime

Agni-II Prime being put on the launch pad ahead of the Range Integration Checks at the Launch Complex-4 in Wheeler Island on December 9. Photo: Special Arrangement
The Defense Research and Development Organization (DRDO) scientists, engineers and system specialists have begun the last-minute preparations for the launch of the much-awaited Agni-II Prime missile from Wheeler Island. 
The missile's maiden test is now expected on Friday, December 10 from the Launch Complex-4. The launch, which was originally scheduled for today (December 9), had to be postponed by one day  due to inclement weather and continuous rain that hit the Orissa coast, due to depression. 
Sources  confirm that the flight readiness review (FRR) meeting was held on  December 8 and the crucial Range Integration Checks (RIC) are being held on December 9. "If the weather holds back, then we are sure for a launch tomorrow. The Met department says that it will be overcast for the next 24 hours with the possibility of slight drizzle. Though Agni-II Prime is an all-weather missile, we are keen to test it for the first time under normal circumstances so that we get every minute data during the launch accurately," an official said.
While this piece is being pushed to the blogspace, the missile is already shifted to the launch pad with the launch managers engrossed in  a series of internal and external checks.
(Hit Tarmak007 for the latest news on Agni-II Prime launch.)

For regular updates, visit: https://www.facebook.com/Tarmak007