Tarmak007 -- A bold blog on Indian defence: Tejas SP-1

For regular updates, visit: https://www.facebook.com/Tarmak007

Clipart Clipart Clipart Clipart Clipart Clipart Clipart Clipart Clipart

Showing posts with label Tejas SP-1. Show all posts
Showing posts with label Tejas SP-1. Show all posts

Sunday, December 21, 2014

LCA Navy creates history in Goa; India joins an elite club


By Anantha Krishnan M
Bengaluru, Dec 20: India on Saturday created a slice of naval history when the first home-grown naval jet Light Combat Aircraft (LCA) Naval Protytype-1 (NP-1), a trainer, took off from the Shore Based Test Facility (SBTF) at INS Hans in Goa for the first time. As reported by OneIndia recently, the NP-1 was piloted by Cmde Jaideep Maolankar, Chief Test Pilot of National Flight Test Centre (NFTC) situated in Bengaluru. 
The SBTF replicates a static model of the Indigenous Aircraft Carrier (IAC) being built at the Cochin Shipyard in Kerala. The aircraft undertook the ski-jump (take-off) 300 meters away from the ramp – having a curved upward shape at one end. The telemetry feed of the crucial trial was also available at NFTC, which was closely monitored by an expert team.
Sources who witnessed the NP-1 event at SBTF told OneIndia that the aircraft accelerated more than expected. “We were hoping for a 150 knot safe fly away at a climb rate of 6.4 degrees. But, the aircraft had a higher acceleration with a climb rate of around 11 degrees, which showcased the confidence of the pilot on the platform,” an official said.
Naval history created, says DRDO D-G: Dr K Tamilmani, one of the visible faces of DRDO and its Director-General (Aero) told OneIndia that NP1 smooth take-off during the first attempt itself will give a huge boost to the programme. “There have been delays which are justifiable if you have tracked the programme from close quarters. We were dating complex technologies and NP-1 scripted naval history at INS Hansa,” Dr Tamilmani said.
He said as part of the current campaign, NP-1 will have five more tests at SBTF (only ski-jumps) to meet all mission parameters. “Based on the test points achieved, we will schedule the next leg of trials. The aircraft will undertake ski-jumps 90 meters from the ramp, with all weapon stores in place,” Dr Tamilmani added.
To a specific query, the top scientist said that the arrester-hook landing trials of NP-1 will be conducted within 6-8 months. He confirmed that the second prototype of naval LCA (NP-2) will undertake its first flight in Bengaluru soon. The NP-1 had its maiden flight on April 27, 2012.
The DRDO quoted its Chief Dr Avinash Chander in an official release saying that it hopes to see home-grown combat aircraft soon flying from the decks of Indian aircraft carriers. 
Validation of the efforts by design teams, says Navy: The Indian Navy is yet to officially name the aircraft and the Chief of Naval Staff Admiral R K Dhowan had recently expressed concerns over the delay in the programme. The Admiral had also reviewed the project ahead of the SBTF trails. 
Reacting to the NP-1’s achievement on Saturday, Rear Admiral D M Sudan, Assistant Chief of Naval Staff (Air) told OneIndia from New Delhi that the NP-1 ski-jump is a validation of the effort of the design team.
“The launch of NP-1 from the SBTF is a historic event. It also shows the faith the Navy has reposed in this indigenous development programme. This event would provide an impetus towards timely achievement of future milestones,” Rear Admiral Sudan said.
We predicted the behavior of the aircraft, says ADA Chief: P S Subramanyam, Director, Aeronautical Development Agency, told OneIndia from Goa that it was a ‘text-book style’ launch of NP-1 at SBTF.
“India has become only the third country in the world (after US and Ukraine) to have carried out such a launch. This technology is only available to a few nations. We were able to predict the behaviour of the aircraft during the entry on the ramp, while on the ramp and after its exit,” he said.
He said Saturday’s mission was a well-orchestrated one with many agencies involved. He said the NP-1 did not have an arrester hook fitted on it. “The arrester-hook landing is not a critical test as ski-jump. Today what we have achieved will be remembered for a long time to come,” Subramanyam said.
Our Take | OneIndia
* All the stake-holders need to be patted on their back for this stupendous achievement. 
* The successful completion of the critical nature of the mission at first attempt itself should further boost the confidence of the user on the programme.
* The Navy has been backing this programme to the hilt, which gave the ADA-HAL-NFTC combine to undertake ski-jump more confidently. User support sans any conditions important for desi programmes to flourish.
* The NP-2 should join the flight-line at the earliest which should help catch-up with some of the lost time.

Saturday, December 20, 2014

More photos from SBTF @INS Hansa | NP-1 ski-jump

Pix: DRDO

Official DRDO video of NP1 ski-jump from SBTF


One year after IOC-2, Parrikar says IAF will finally get Tejas by March 2015

By Anantha Krishnan M
Bengaluru, Dec 19: The Indian Air Force (IAF) will ‘officially’ get to fly the first series production (SP-1) variant of India’s Light Combat Aircraft Tejas by March 2015. Having skipped many deadlines in the past, the fresh dates announced by Defence Minister Manohar Parrikar in Lok Sabha today, will again put the spotlight on Tejas, which is currently meeting the mandatory Final Operational Clearance (FOC) test-points.
Interestingly, Parrikar’s statement comes on the eve of Tejas completing one year after being given the Initial Operational Clearance (IOC) on December 20, 2013. “The first of the IOC standard Tejas (SP-1) has been built and successfully completed its maiden flight on September 30, 2014. This aircraft will be handed over to IAF by March 2015 after some upgrades,” Parrikar informed Lok Sabha in a written reply.
The SP-1 was rolled out from the brand new Tejas facility of Hindustan Aeronautics Ltd (HAL) in Bengaluru. The minister said that the second aircraft (SP-2) will also be ready by March 2015 for its maiden flight and the first 20 aircraft will be built by 2017-18. The first 20 Tejas will be in the IOC configuration and the remaining 20 in the FOC configuration.
FOC dates further pushed to Dec 2015: The minister also announced that the crucial FOC (meeting all parameters set by the IAF, which is called Air Staff Requirement) is “likely to be only achieved by end of 2015.” This programme was expected to get FOC by mid-2015 and sources tell OneIndia that the minister might have announced the fresh likely dates after getting a briefing from the IAF. 
DRDO Chief Dr Avinash Chander told OneIndia on Friday that all planned events of Tejas FOC are on track. “The programme is heading in the right direction and the trials mandated under FOC are being done,” Dr Avninash said.
On another query, the DRDO chief said that the third trial of Agni-5 missile will not happen this month. “The fresh dates are being worked out. It will be only sometime in January next year,” Dr Avinash said.
He also complemented the DRDO for successfully testing a 1000 kg glide bomb today (in Bay of Bengal off the Odisha coast). “India has now the capability to design, develop and launch heavy bombs for delivery up to 100 km away with high precision,” Dr Avinash was quoted by DRDO in a release.
DRDO says all major critical challenges achieved: DRDO Director-General (Aero) Dr K Tamilmani told OneIndia that the project has achieved all major challenges so far. “So far there are no critical challenges to overcome. A number of Tejas variants are undertaking trials and that’s a positive sign for the project,” Dr Tamilmani said.
When specifically asked about the FOC dates getting postponed, the top DRDO brain said: “We are awaiting for some more components (nose cone quartz radome and the air-to-air refueling probe) to arrive. There is a delay from the part of getting them.”
He said Tejas has proven multiple test-points related to its weapon release. “Functional aspects of the radar have been proved. Issues related to range will be fixed with the new radome,” he added.
We will ramp up production, says HAL: HAL Chairman Dr R K Tyagi said that Hindustan Aeronautics Ltd (HAL) will ramp up the Tejas series production soon. “We are confident of increasing it from eight to 16 aircraft and we are in talks with the government. We hope the IAF order for Tejas goes up significantly from the current numbers,” Dr Tyagi said.
He also demanded a level playing field for HAL when the Ministry of Defence invites competitive bids. “Everyone should be given an equal chance. The HTT-40 programme is a challenge to our prestige and pride,” Dr Tyagi said, while releasing a new book on Tejas, IJT and Jaguar upgrade written by former LCA (Director) in HAL Yogesh Kumar. The book is titled: “Lead and Execute: The Art of Managing Large Scale Projects.”
Our Take | OneIndia
  • It is a matter of concern that Tejas deadlines are getting shifted again.
  • MoD must bring in more synergy between HAL-ADA.
  • Lessons learnt from Tejas Mk-1 must act as pointers for future projects like Tejas Mk-II (if IAF needs it), AMCA, UCAV etc.
  • Emotions have no place when your fighter plane needs to gain combat-readiness as desired by the user.

Wednesday, October 1, 2014

Tejas production variant SP-1 makes maiden flight in Bangalore | First flight without telemetry support | Two test variants on 'bombing mission' in Jaisalmer

Tejas seems to be out of the woods with the production variant's first flight. Photo: Basani Satish Kumar 
By Anantha Krishnan M
Express News Service
Bangalore: The Indian Air Force’s (IAF) wait to induct a home-grown fighter jet into its squadron inched a step closer when the first Tejas series production (SP-1) aircraft kissed the skies on Tuesday. Military sources confirmed to Express that during the 25-minute flight, Tejas SP-1 touched a maximum speed of 0.6 Mach, copying textbook maneuvers befitting a maiden outing. The sole take-away from this flight was the fact that there was no telemetry support to the pilot.
Built by Hindustan Aeronautics Ltd (HAL) and designed by Aeronautical Development Agency, the Tejas SP-1 was flown by seasoned Test Pilot Air Commodore (Retd) K A Muthanna, with a Hawk trainer as the chase aircraft. “We did the HSTT (High Speed Taxi Trial) on Monday and the test results were flawless. During today’s flight, the pilot had no link-up with the telemetry team during the entire duration of the flight. This is a first for the programme, similar to what happens while in a squadron scenario,” an official associated with project said.
The build of the Tejas SP-1 seems to have given the team huge confidence to go for the maiden flight. “We had no corrections to make before and after the flight. This is different from what we were used to on earlier occasions. The production version aircraft is definitely superior on all fronts. We will resume the flight on SP-1 after a week,” the official said.
While the programme has to travel some more distance before the much-awaited induction into the IAF, two Tejas aircraft from the flight test programme are currently in Jaisalmer undertaking 'bombing mission.' “New weapons (250 kg and 450 kg bombs) are being integrated into the aircraft. The AoA (Angle of Attack) is also coming closer to 26 degrees, which helps the pilot to undertake care-free manoeuvring. In the next there months we are also lining up the aircraft to fire some new missiles as well,” the official said.
https://twitter.com/writetake
Also read: Did SP-1 fly for me?

For regular updates, visit: https://www.facebook.com/Tarmak007